What shapes your quote
Depth
The single biggest driver. A 45 m residential borehole costs far less than a 120 m estate well — every extra metre is more fuel, rods, casing and rig hours.
Geology
Abuja and most of Nasarawa sit on hard basement rock: slower DTH drilling and more casing. Sedimentary areas drill faster but may need longer screens.
Casing & Screens
UPVC casing is standard; steel casing, special screens and gravel packs cost more — but unstable formations leave no safe cheaper option.
Pump & Power
Pump size (HP), stainless vs cast-iron body, control panel, and whether you power it with grid, generator or solar all change the final figure.
Common pricing questions
When will I receive a firm quotation?
We confirm your price after assessing your site. Your written quote identifies the survey, drilling and casing scope, the pump specification, and any storage, distribution or testing work you request.
Why do prices differ so much between quotes?
Because the quote often hides different scope. Check what's included: is a geophysical survey done? What casing grade? Which pump brand and HP? Are test pumping and development included? A borehole quoted per-metre without casing or pump looks cheap until the extras arrive. We itemise everything before we start.
Do I really need a geophysical survey?
In this region — yes. Abuja and most of Nasarawa sit on basement rock where water travels in narrow fracture zones. Drilling 10 metres from a productive fracture can give a dry hole. A survey costs a fraction of a drilling job and tells you where — and roughly how deep — the water actually is.
What does 'guaranteed water yield' mean?
After survey we agree a target yield in litres per minute for your well. We drill and develop until the borehole sustains it. If survey results show your land cannot support an economic borehole, we say so before you spend drilling money — that is the honest version of a guarantee.
How long does drilling take?
Survey: one day. Drilling and casing: typically 2 – 5 days for a residential borehole, longer for deep or commercial wells. Pump installation, test pumping and handover: 1 – 2 days more. Weather, access and formation surprises can extend this.
Do you offer payment in stages?
Yes — the normal pattern is survey paid up-front, then mobilisation, then drilling progress payments, with the balance after successful test pumping. Every milestone is stated in your written scope of work before mobilisation.
Which areas do you cover?
We serve Abuja FCT and take on borehole projects across Nigeria. Share your town and state so we can confirm site access, assessment arrangements and mobilisation.