Family compound borehole with overhead tank
Complete water solution for a 6-bedroom duplex: VES survey, DTH drilling through basement rock, casing, 1.5 HP submersible pump and a 2,500 L overhead tank with reticulation to the building.
- Depth
- 62 m
- Yield
- ~1,200 L/hr sustained
- Power
- Grid + changeover
- Duration
- 6 working days
Solar-powered borehole for a private school
A boarding school needed water without diesel bills. We surveyed, drilled and installed a solar pumping system feeding two 5,000 L tanks — enough for kitchen, hostel and laundry demand.
- Depth
- 78 m
- Solar array
- 3.2 kWp with MPPT controller
- Storage
- 10,000 L total
- Duration
- 9 working days
Estate production borehole serving 40+ households
After two failed boreholes by other drillers, our survey mapped a productive fracture zone. The re-sited production well now feeds a central tank and reticulated standpoints for the whole estate.
- Depth
- 85 m
- Yield
- ~4,500 L/hr sustained
- Pump
- 3 HP stainless submersible
- Duration
- 12 working days
Borehole rehabilitation and pump replacement
An 8-year-old borehole had dropped to a trickle. We retrieved the failed pump, airlift-flushed the screens, descaled the casing and installed a new 1 HP pump — restoring the well at under half the cost of a new one.
- Depth
- 55 m (existing well)
- Works
- Flush, descale, re-pump
- Result
- Yield restored to ~900 L/hr
- Duration
- 3 working days
What clients say
“They surveyed our compound in Gwarinpa, told us the truth about where the water was, and finished the borehole exactly at the depth they estimated. Water has never dropped since installation.”
“Our estate in Mararaba had two failed boreholes before HydroDrill came. Their survey team found the fracture zone, drilled once, and we have steady water for over forty households.”
“The solar system they installed for our school in Keffi runs the pump all day without diesel. Neat work, patient explanation of everything, and they documented the whole job.”
“My old borehole went weak after eight years. They pulled the pump, cleaned the screens and redeveloped it — half the cost of drilling new, and the yield is back to normal.”